Al Hazami Building Contracting is committed to performing work in the safest manner possible, consistent with good construction practices. Because of this our safest record is consistently better that the industry average. Our extensive safest program factor in almost every faces of our valuable assets. Safety is a determining factor in almost every facet of our work.
A healthy environment both at work place and residences plays a crucial role in increasing the productivity of any individuals. Keeping this mid, we put a lot of emphasis on the safety.
OUR SAFETY PLAN
- a) Keeping the site neat and tidy both on daily and regular basis.
- b) Setting up of safety organisation.
- c) Safety training at all levels
- d) Regular organisation site safety meeting
- e) Investigate each accident in the detail and recommend preventive to the concerned project manager.
- f) Remove hazards from time to time Make use of necessary protective equipment and follow safe work practices.
- g) Regular safety inspection through CHECK LISTS.
- h) Regular evaluation of housekeeping zones in the sites.
- i) Plan and implement safety promotional activities like safety slogan competition, safety posters competition etc.
- j) Display safety posters at the sites.
PREVENTIVES MEASURES AGAINST SPECIFIC HAZARDS
For minor injuries make use of first aid box which is kept on site.
a) Thereafter further treatment.
In case of cuts and scratches, clean the wound with surgical spirit or dettol.
Wound should be covered with sterilised bandage.
Do not attempt to remove the foreign particle embedded in the wound
b) In case of burn
Flush the burn area with cold water
Do not remove struck clothing.
Report to hospital for further treatment.
c) In case of electrical shocks
Stand on dry ground or dry wooden plank and switch off the power supply
Dis-engage the victim with the help of dry wooden pole or ply.
If the victims is unconscious or has stopped breathing, being artificial respiration immediately.
Our safety committee for site is meant to function as follows:
a) To assess the effectiveness of company’s safety program.
b) To implement action necessary to comply with legislation.
c) To report on us safe or unhealthy condition together with recommendations
d) Conducting safety audits of project site.
e) Actions required complying with safety audit report to be prioritised.
f) Giving assistance in the development of safety system at work.
g) Conduction on the jog safety meeting.
h) Appointment of safety personnel for the project.
i) The scope of safety officer’s duties and functions.
j) Emergency plan for obtaining medical assistance, ambulance and direction of rescue operation.
k) Display of safety caution boards and awareness posters
l) Accident reporting and investigations.
m) Analysis of accidents.
n) To take disciplinary action for safety violations.